Browse all practice questions for the Tilt Up Certification Practice Exam. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

Tilt Up Certification Practice Exam course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • When should the final site check be for debris/cleanliness/lack of water?
  • How does the addition of water to fresh concrete affect the concrete strength?
  • What is a good method for reducing the impact of cold weather on fresh concrete?
  • What is the typical wall-to-floor area ratio in tilt-up construction?
  • The minimum clear distance between parallel bars is related to the largest aggregate by which factor?
  • What is the most common finish on concrete?
  • A panel release from the crane should occur under which condition?
  • When casting in hot weather, which timing is recommended?
  • Which item is included on a pre-pour checklist but not on a forming checklist?
  • Which term defines the devices necessary for lifting, setting, and bracing tilt-up panels?
  • Which of the following is a typical requirement for placing reinforcing steel?
  • Inserts need to be properly oriented
  • Chamfers are normally formed at a ____ degree angles
  • How are intersecting braces handled at corners of buildings to maintain alignment?
  • What does 'walking' a panel mean?
  • In cold weather, using a rich mix serves to
  • What is the minimum SOG thickness recommended for tilt-up projects?
  • High alkalinity can cause skin burns.
  • Which statement about form liner sealing is correct?
  • A minimum of half of the supporting feet of the insert must remain in contact with the slab during concrete placement.
  • Which of the following is a common method to achieve weather tightness in panel joints?
  • What is the purpose of the crane cable line being vertical to the panel surface and over the center of the panel?
  • PSF ROT formula correctly expressed as which option?
  • The spacing between reinforcing bars may not exceed which value?
  • In a panel layout discussion, which combination of roles is typically included?
  • For tilt-up panel construction, which statement about door and window frames options is correct?
  • What is the preferred method to remove chemical bond breaker residue?
  • Chamfers are normally formed at 45 degrees.
  • What are the two components of concrete?
  • What steps should be taken if panels are to be erected from outside of the building?
  • Which option best represents the items to inspect on the crane prior to lifting?
  • What is the reason for releasing the bottom connection first during brace removal?
  • When should curing of the concrete for the slab on grade and/or panels begin?
  • What does a spreader bar do?
  • Which statement best describes the labeling requirement for reinforcement?
  • Depending upon the shape of the building footprint and height of the wall panels, the minimum size for maximum economy is:
  • If additional loads are placed on the panel, what is a potential consequence?
  • Which stakeholder should be informed about the form liner profile?
  • Which is an advantage of reducing water content in concrete?
  • During site planning, why is it essential to locate power lines?
  • The true statement about tilt-up panel construction.
  • What is the tolerance on lifting insert locations?
  • When can the crane release the panel during erection?
  • Horizontal bars are centered by positioning chairs.
  • What is the recommended safety factor for brace anchors?
  • Which statement best describes the start of reinforcement placement in tilt-up panels?
  • What is the typical width of the panel joint in tilt-up construction?
  • What are the three temporary construction loads imposed on the slab that occur during tilt-up construction?
  • Which listing correctly names the participants in a panel layout discussion?
  • Explain the best solution to deal with column block outs when panels need to be cast over them.
  • Who gives the crane operator the signals during the panel lift?
  • Which statement describes the devices necessary for lifting, setting, and bracing tilt-up panels?
  • Modulus of rupture is a measure of the bending or tensile strength of unreinforced concrete.
  • For tilt-up panels FF/FL around what range?
  • Who should be included in a panel layout discussion?
  • What is the definition of a tandem pick?
  • On average, how many panels can a six-man crew place in one day?
  • Which option best describes a method to reduce water intrusion in tilt-up panels?
  • Where are lifting inserts located and what is their function?
  • Which statement about lifting tilt-up panels is accurate?
  • What is the tolerance for bar placement in the thickness of the panel?
  • Exposed aggregate mixes should not include what type of aggregate?
  • The statement 'It is the responsibility of each crew member to look after himself/herself, the liability/risk is not shared' is true or false?
  • When lifting panels from inside the building, the head or top of the panel should be nearest to which edge?
  • What is the minimum slab on grade thickness recommended for tilt up projects?
  • Which statement about reinforcing mats is correct?
  • The minimum panel size for maximum economy is influenced by which factors?
  • Portland cement is acidic or basic?
  • In tilt-up construction, panels are typically cast outside face up.
  • Which bolt type is used with coil inserts?
  • What is the minimum number of braces required per panel?
  • What are two possible causes of tangled cables?
  • What steps should be taken prior to the crane and lifting crew arriving on the construction site?
  • What minimum crane capacity multipliers are recommended for different crane types relative to the heaviest panel including rigging weight?
  • Embed plates should be located such that they are Exposed on the surface of the concrete.
  • What is the target compaction for the slab subgrade?
  • The modulus of rupture and the subgrade modulus combined determine the required slab thickness.
  • Sandwich panel
  • Attaching form supports to the slab with adhesives requires the brackets to be of a plastic material.
  • In tilt-up construction, exterior walls are typically windowless.
  • How should the edges of a reveal strip be attached to the slab?
  • Where are strong backs attached?
  • What wind speed is used for designing braces?
  • Casting slabs should be finished
  • Which statement is true regarding side loading on lifting hardware?
  • The statement 'It is much easier to identify issues in the panel dimensions once the panels have been lifted and placed' is
  • Where is the footing elevation set in relationship to the bottom of the panel?
  • What is the purpose of attaching braces above the panel mid-height?
  • Which statement best describes the timing of the final site check for debris, cleanliness, and water?
  • Define Tilt-up Sandwich Panel.
  • Before lifting, what minimum compressive and flexural strengths should tilt-up concrete panels achieve?
  • In tilt-up construction, which direction should a panel be plumbed first?
  • What is the percentage of floor space range for all the panels to be poured on the slab to prevent the need for stacking?
  • What is the last process required in the placement of reinforcement?
  • What method can be used to reduce the occurrence of waffle cracking over the reinforcing bars?
  • Which describes modulus of rupture?
  • What is a method to double check your formwork dimensions?
  • Which problem can hinder the erection process if panels are not stacked in the correct order?
  • Which item is part of a forming checklist?
  • The h/t ratio refers to
  • In tilt-up panel erection planning, where should erection begin, and which panel should be introduced first by height?
  • When should saw joints be made?
  • A proper layout plan should provide enough space between the panel being erected and panels yet to be erected to attach temporary wind braces to the slab.
  • A concrete deadman generally weighs nearly as much as the wind load in a brace. This statement is true or false?
  • Which option correctly identifies materials used for filling sawjoints?
  • If a panel cannot be set in its final position after lifting, what should be done?
  • Which item is NOT among the five items to consider when designing the slab-on-grade?
  • A closure strip in a slab is
  • What does the term 'paste' refer to in cementitious mixes?
  • How many coats are recommended for bond breakers?
  • Helical systems are gaining popularity primarily because of which factor?
  • What is the typical elapsed time between the crane walking the panel and the outriggers being set?
  • Is it true that lifting hardware can be expected to experience a significant amount of side loading during lift?
  • Cold Water Concrete: which conditions are listed for its use?
  • What is the most common foundation system?
  • Strongbacks are used in tilt-up construction for which condition?
  • In sandwich wall panel casting, which statement is true?
  • What is the ideal tilt up building?
  • The maximum spacing between reinforcing bars is determined by which factors?
  • Which practice helps reduce moisture loss in hot weather concreting?
  • Which statement about subgrade compaction using 90%–95% modified standard proctor is true?
  • How many inches should a panel be within plumb prior to releasing the rigging?
  • On average, how many panels' formwork (ready for placement) can a two-man crew complete in a day?
  • What finish should a slab on grade have if used for a casting platform?
  • What is the primary reason water is removed from the panel perimeter and openings prior to lifting tilt-up panels?
  • Which component transfers load from the cable to the lifting at each lift point?
  • Who is the father of tilt up?
  • What is used to make panel joints weather tight?
  • OSHA minimum horizontal separation between power lines and crane rigging; what distance?
  • Subgrade modulus is often called which set of terms?
  • What is the process of calcination?
  • Reveal strip edges should be attached to the slab using what method?
  • Saw joints are used to control what?
  • In cold weather practices, what strength is required before protecting from freezing?
  • Which action is specified for the ends of form liners?
  • Which component handles two lift points with one connection to the spreader bar?
  • Which foundation statement correctly identifies acceptable foundation elements for tilt-up construction?
  • What is the last process required in the placement of reinforcement?
  • What is the common practice for panel size and weight?
  • When should panel brace inserts connected to the slab be inspected and how often?
  • At corners, braces must be offset at different heights but stay within which tolerance?
  • What is the rule of thumb temperature for hot weather concrete practices?
  • Which statement about tilt-up panel framing is correct?
  • Does higher slump concrete reduce shrinkage?
  • For a panel with largest aggregate size 3 inches, the minimum clear distance between parallel bars should be at least how many inches?
  • What is the common 28 day compressive strength of concrete used in tilt-up construction for the panels and what is the typical lift compressive strength?
  • If the floor area of a tilt-up building is 10,000 square feet, approximately what is the exterior wall surface using the rule of thumb?
  • When should grout be placed under the panel?
  • What is a blind pick?
  • How many inches should a panel be within plumb prior to releasing the rigging?
  • How many panels per day can a 6 man crew complete?
  • Which option lists the trio of professionals typically involved in a panel layout discussion?
  • What is the last panel in a building referred to?
  • In tilt-up planning, which statement best describes the order of erection based on height?
  • what is a more accurate way (what device can you use) to place anchor bolts for interior footings?
  • ASTM A615 reinforcement is required to be marked with what designation?
  • Sister Form
  • Before crane operations begin, what should be done with clasps, anchors, and other components?
  • What is the primary advantage of using plastic tipped chairs?
  • When should the slab be placed after subbase placement?
  • In cold weather concrete practices, what defines cold weather conditions?
  • Which of the following represents a method for weather-tight panel joints?
  • What is the minimum clear cover for bars exposed to exterior?
  • Why must the area from the panel pick point to final position be kept clear?
  • In cold weather concreting, what is one purpose of air-entrainment?
  • Which term describes the chemical process that causes concrete to harden?
  • Which of the following is NOT a factor of hot weather concreting?
  • What form material is typically used for sandwich panels?
  • When lifting how do you tie the rebar?
  • Mats of reinforcing steel must be properly supported and tied sufficiently to allow workers to walk on the mats.
  • Chamfers are normally formed at what angle?
  • Shimpaks are typically available in which sizes?
  • Where should knee braces be connected and how should lateral braces behave?
  • P-Delta effect refers to
  • Where are strong backs attached?
  • How should cleats that support be attached to the slab?
  • Which statement about curing tilt-up panels is NOT true?
  • In stacking panels of different heights, what is a key reason for keeping upper panels the same size or smaller?
  • Explain how the panels should be stacked for casting when stacking panels of different heights in regards to their size and alignment.
  • Why is the rigging aligned to the panel's center of mass rather than the panel's geometric center?
  • Panels are typically cast outside face up.
  • Pipe braces are provided by which party for temporary support of tilt-up panels?
  • If additional loads are placed on the panel, which of the following outcomes could occur? (Select best single option)
  • Saw joints should be filled with which materials?
  • In a panel layout discussion, which trio of professionals is recommended?
  • Which item is embedded in the panel and used to connect the lifting hardware to cables?
  • Why is tilt up sustainable?
  • When does bond breaker need to be applied?
  • Which method is described to weather-tighten panel joints?
  • What is the function of lifting hardware in tilt-up lifting?
  • Which party is responsible for verifying crane equipment is checked and prepared?
  • It is acceptable to change the chair height to assist with the construction of tilt-up panels as long as the reinforcement still meets the specified concrete cover.
  • Minimum clear distance between parallel bars must be at least the greater of the bar diameter (1 inch) or 1.33 times the size of the largest aggregate. Which statement best expresses this rule?
  • What factors can cause the panel's center of mass to differ from the panel's geometric center?
  • Sawjoints should be filled with which materials?
  • Subgrade modulus is an important characteristic for determining the soil's supporting value.
  • The location of lifting anchors is a consideration in tilt-up slab design.
  • Which statement about coil bolts and inserts compatibility is true?
  • Which option best describes the scenario where braces above mid-height are used?
  • Shimpaks are typically available in which sizes? (Alternate phrasing)
  • Which of the following is a factor of HWC?
  • Which method is described for reducing water intrusion into tilt-up panels?
  • What is the average daily cost of the equipment used for placing concrete?
  • In panel joint sealing, which term describes the process of sealing joints to prevent air or water passage?
  • What is the purpose of bond breaker in tilt-up construction?
  • Which of the following is NOT a component of the paste used in cementitious mixes?
  • In tilting a panel, how should the rigging be arranged relative to the center of mass and the panel center?
  • Which finish option is used for tilt-up slab surfaces?
  • Which of the following is a primary design consideration for slab-on-grade thickness?
  • When installing lateral and knee braces, what is their overall effect?
  • What is the final recommended action when removing temporary bracing?
  • Where should embed plates be located within a tilt-up panel?
  • Embed plates should not be wet or "floated" into place.
  • When are panel braces typically attached to the panel?
  • Which items should be included in the site inspection prior to erection?
  • Describe the simple method to determine the approximate weight of a panel without openings.
  • Which factor is essential to ensure the panel develops the desired properties during curing?
  • Where is the correct rigging configuration found?
  • List the items that would be included on a pre-pour checklist for panels?
  • List the materials that can be used to fill floor joints. What should not be used?
  • Subgrade should be compacted to at least what percentage?
  • Using the rule of thumb, what is the percentage ratio between total exterior wall surface and floor area?
  • Bundles of reinforcing steel are tagged to indicate
  • Coil bolts and inserts should be
  • Which item is provided by the general contractor for temporary support of tilt-up panels?
  • What is the floor brace used for?
  • What is the principal reason for air-entrainment in concrete?
  • If a panel sticks to the floor slab, what method is appropriate to aid freeing?
  • Who must verify the crane equipment is checked and prepared?
  • Which item is included on a completed panel drawing but not on a pre-pour checklist?
  • Service loads of a warehouse building's slab on grade rarely exceed?
  • What should be done to free a panel that sticks to the floor slab?
  • Which term describes the ratio of unsupported height to thickness?
  • List the items that should be on a forming checklist.
  • Sister Form differs from edge forms under which condition?
  • Placing reinforcement begins with pouring of concrete.
  • Are #9 bars commonly used in tilt-up panel design?
  • A panel layout discussion should include which roles?
  • When erecting panels from outside, which action regarding the perimeter is recommended?
  • Which combination is used to fill joints in tilt-up panels?
  • Which sequence correctly describes the removal of temporary bracing from a panel?
  • What are some elements of the crane that should be inspected prior to lifting?
  • What is a sandwich panel?
  • Which practice best minimizes floor cracking?
  • Ground release hardware eliminates the need of ladders to remove inserts.
  • When are stepped footings used?
  • In the removal process, what is the final action?
  • What should you use to ensure snapped lines do not disappear?
  • Subgrade modulus is a measure of the resiliency or compressibility of the soil.
  • List the items of a completed panel drawing.
  • A panel layout discussion should include which of the following groups?
  • Using shims at 3rd points under a tilt-up panel can help to
  • Tilt-up panels that include insulation between concrete layers are best described as sandwich panels.
  • Which statement about tilt-up foundations is true?
  • Which item is NOT typically included on a completed panel drawing?
  • What is the purpose of sheaves in tilt-up lifting?
  • Sister form is similar to edge forms, differing only when panels are cast side by side, separated with only a common form. This statement describes sister form as:
  • A closure strip in a slab is poured back when infilling after panel erection.
  • In the Type IIIA designation, what does the letter A indicate?
  • Minimum distance beneath openings is
  • Define 'panelizing' the building.
  • Which crane type requires the smallest capacity multiplier relative to the heaviest panel including rigging?
  • Which foundation systems are acceptable for tilt-up construction, and which are not allowed?
  • What is used to fill joints?
  • How can you test the effectiveness of a bond breaker after it is in place?
  • What are the types of pipe bracing used in tilt-up operations?
  • What type of finish do you want on your slab?
  • Casting slabs should be finished
  • Hydration
  • Panels may be lifted prior to the concrete achieving its design compressive and flexural strength.
  • What is the purpose and method of installing lateral and knee braces?
  • What is the most important item on the tilt-up contractor's daily record when the panels are up, braced, and roof diaphragms are not complete?
  • To achieve weather-tight joints between panels, which technique is described?
  • What is the maximum aggregate size for tilt-up panels?
  • Is Portland cement acidic?
  • Which option best describes the weather-tight sealing method for panel joints?
  • Which option describes an acceptable curing method for tilt-up panels?
  • Which factor should be considered most when curing tilt-up panels with a curing method?
  • What are the two most important items when planning a tilt-up project in regards to the panels?
  • Door and window frames may be specified as embedded or cast-in-place for tilt-up panels.
Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy